OFFICE WORK OFFICE WORK in surveying consists of converting the field measurements into a usable format. The conversion of computed, often mathematical, values may be required immediately to continue the work, or it may be delayed until a series of field measurements is completed. Although these operations are performed in the field during lapses between measurements, they can also be considered office work. Such operations are normally done to save time. Special equipment, such as calculators, conversion tables, and some drafting equipment, are used in most office work.In office work, converting field measurements (also called reducing) involves the process of computing, adjusting, and applying a standard rule to numerical values.Computation In any field survey operation, measurements are derived by the application of some form of mathematical computation. It may be simple addition of several full lengths and a partial tape length to record a total linear distance between two points. It maybe the addition or subtraction of differences in elevation to determine the height of instrument or the elevation during leveling. Then again, it maybe checking of angles to ensure that the allowable error is not exceeded.Office computing converts these distances, elevations, and angles into a more usable form. The finished measurements may end up as a computed volume of dirt to be moved for a highway cut or fill, an area of land needed for a SEABEE construction project, or a new position of a point from which other measurements can be made.In general, office computing reduces the field notes to either a tabular or graphic form for a permanent record or for continuation of fieldwork.Adjustment Some survey processes are not complete until measurements are within usable limits or until corrections have been applied to these measurements to distribute accumulated errors. Small errors that are not apparent in individual measurements can accumulate to a sizeable amount. Adjusting is the process used to distribute these errors among the many points or stations until the effect on each point has been reduced to the degree that all measurements are within usable limits.For example, assume that 100 measurements were made to the nearest unit for the accuracy required. This requires estimating the nearest one-half unit during measurement. At the end of the course, an error of + 4 units results. Adjusting this means each measurement is reduced 0.04 unit. Since the measurements were read only to the nearest unit, this adjustment would not be measurable at any point, and the adjusted result would be correct.SIGNIFICANT FIGURES. The term known to be exact.In a measured quantity, the number of significant figures is determined by the accuracy of the measurement. For example, a roughly measured distance of 193 ft has three significant figures. More carefully measured, the same distance, 192.7 ft, has four significant figures. If measured still more accurately, 192.68 ft has five significant figures.In surveying, the significant figures should reflect the allowable error or tolerance in the measurements. For example, suppose a measurement of 941.26 units is made with a probable error of 0.03 unit. The 0.03 casts some doubt on the fifth digit which can vary from 3 to 9, but the fourth digit will still remain 2. We can say that 941.26 has five significant figures; and from the allowable error, we know the fifth digit is doubtful. However, if the probable error were 0.07, the fourth digit could be affected. The number could vary from 941.19 to 941.33, and the fourth digit could be read 1, 2, or 3. The fifth digit in this measurement is meaningless. The number has only four significant figures and should be written as such.The number of significant figures in a number ending in one or more zeros is unknown unless more information is given. The zeros may have been added to show the location of the decimal point; for example, 73200 may have three, four, or five significant figures, depending on whether the true value is accurate to 100, 10, or 1 unit(s). If the number is written 73200.0, it indicates accuracy is carried to the tenth of a unit and is considered to have six significant figures.When decimals are used, the number of significant figures is not always the number of digits. A zero may or may not be significant, depending on its position with respect to the decimal and the digits. As mentioned above, zeros may have been added to show the position of the decimal point. Study the following examples:0.000047 . . . . . . .two significant figures 0.0100470 . . . . . . .six significant figures 0.1000470 . . . . . . .seven significant figures 2.0100470 . . . . . . .eight significant figures In long computations, the values are carried out to one more digit than required in the result. The number is rounded off to the required numbers of digits as a final step. ROUNDING OFF NUMBERS. Rounding off is the process of dropping one or more digits and replacing them with zeros, if necessary, to indicate the number of significant figures. Numbers used in surveying are rounded off according to the following rules:1. When the digit to be dropped is less than 5, the number is written without the digit or any others that follow it. (Example: 0.054 becomes 0.05.)2. When the digit is equal to 5, the nearest EVEN number is substituted for the preceding digit. (Examples: 0.055 becomes 0.06; 0.045 becomes 0.04.)3. When the digit to be dropped is greater than 5, the preceding digit is increased by one. (Example: 0.047 becomes 0.05.)4. Dropped digits to the left of the decimal point are replaced by zeros.5. Dropped digits to the right of the decimal points are never replaced.CHECKING COMPUTATIONS. Most mathematical problems can be solved by more than one method. To check a set of computations, you should use a method that differs from the original method, if possible. An inverse solution, starting with the computed value and solving for the field data, is one possibility. The planimeter and the protractor are also used for approximate checking. A graphical solution can be used, when feasible, especially if it takes less time than a mathematical or logarithmic solution. Each step that cannot be checked by any other method must be recomputed; and, if possible, another EA should recompute the problem. When an error or mistake is found, the computation should be rechecked before the correction is accepted. |
||