Tweet |
Custom Search
|
|
SUMMARY In this chapter we have discussed various programs, reports, and records needed by GS supervisors. The titles of the different sections of this chapter may sound like many of those presented in some engineering administration publications. Even though the topics are in other publications, the information in this chapter is specific togas turbine-powered ships. Throughout this chapter you have been referred to the EOSS, applicable technical manuals, or the PMS for specific information. You must use these References to guide you through the procedures. Use of the EOSS, technical manuals, and the PMS will help you make the proper decisions to best handle the duties of a GS supervisor. Figure 1-10.- Sample BIRMIS report. 1-26 35 Figure 1-10.- Sample BIRMIS report- Continued. Figure 1-10.- Sample BIRMIS report- Continued. Figure 1-11.- Boiler water chemistry check sheets. Figure 1-12.- Feedwater chemistry check sheets. Figure 1-13.- Handout #l for sample lesson plan. Figure 1-13.- Handout #l for sample lesson plan- Continued. Figure 1-13.- Handout #1 for sample lesson plan- Continued. Figure 1-13.- Handout #l for sample lesson plan- Continued.
|
||